Term Details

Display Hierarchical | Alphabetical | KWOC | KWIC


Top Terms > Construction and maintenance > Maintenance > Maintenance of specific facilities > Highway maintenance > Pavement maintenance > Dowel bar retrofit

Find related records

Search with TRT term only:

TRB Publications Index
Research in Progress
TRID

Expanded search with
narrower TRT terms:

TRB Publications Index
Research in Progress
TRID

Dowel bar retrofit (Fmuhpd)

Definition
Cutting slots along the wheel path of a pavement and placing epoxy-coated dowel bars in the slots covered by waterproof caulk. (Source: Team: adapted from www.dot.ca.gov/hq/esc/Translab/pubs/D11_Route8.pdf)
Broader Term
Pavement maintenance (Fmuhp)
Related Terms (Hierarchical)
Crack and seat treatment (Fmuhpc)
Full-depth reclamation (Fmuhpf)
In-place recycling (Fmuhpi)
Mudjacking (Fmuhpm)
Patching (Fmuhpp)
Resurfacing (Fmuhpr)